HIGHWOOD, U.S.A.
Tamaqua Industrial Development Enterprises retained the services of Prodesign Plus, P.C. to prepare a land development plan, erosion and sediment control plan and post construction storm water management plan and calculations for their proposed 21,500 square foot building project to be occupied by Highwood USA. The project is located in the Tidewood East Industrial Park in Hometown, PA. More details...
LOCUST RIDGE II - WIND FARM
Our firm was retained by WJP Engineers to conduct storm water infiltration testing on their proposed Wind Farm project site. The proposed Wind Farm will span through Conyngham Township of Columbia County, Union Township, West Mahanoy Township, and Mahanoy Township of Schuylkill County. More details...
POLY PLASTICS PRODUCTS
Mr. Tim McGowan retained Prodesign Plus, P.C. to complete an As-built property survey of the Poly Plastics Products Incorporated project site located in Delano Township, Schuylkill County. Mr. John X. Cherko completed a survey of the property. The completed property plan indicated the existing buildings/expansions, above ground site features and property lines and corners. More details...
TRANSWESTERN POLYMERS, INC.
In January of 1995, Prodesign Plus, P.C. entered into an agreement with the Tamaqua Industrial Development Enterprises (TIDE) for the preparation of preliminary and final site grading and land development plans, storm water management calculations, and a national pollutant discharge elimination system (NPDES) permit for the construction of a new 40,000 square foot building to be located in the Tidewood East Industrial Park, Tamaqua.This would be occupied by Transwestern Polymers, Inc. of California. More details...
WAGNER INDUSTRIES
Mr. Kenneth Wagner and his wife Dolores Wagner retained Prodesign Plus, P.C. to complete site grading/land development plans for a proposed industrial building, located in the Frackville Industrial Park. John X. Cherko completed a survey of the project site property. Our firm utilized this survey information to then complete erosion and sediment control plans for the project. More details...